In July 2021, we completed the installation of another SPS for the Wildwood owners at their Koobeja property in The Lakes, Western Australia. The solution comprises a 50kW Sinexcel hybrid inverter and 100kWh battery storage capacity using AlphaESS batteries and 40kWp of solar PV. The solar is mounted on a shed at the property and connected to the hybrid inverter that is housed in a custom-built plant room that was added to the back of the shed. A 50kVA diesel generator is also connected to the system and a second 50kVA diesel generator is available for backup or maintenance via a manual transfer switch.
New Renewable Energy Solution Consulting
We have been working with Image Resources in a consulting role since July-21 to help them develop renewable solutions for their new mine site and to project manage a new grid connection. The new mine located approximately 130km North of Perth requires a new 25 km overhead network to be installed for the main processing plant. The mines camp and bores however will not be able to be grid connected therefore we have been working with the client to design suitable off-grid stand-alone power systems (SPS) to accommodate their power requirements.
Image Resources has also engaged Sunrise to assist with developing an energy strategy and execution plan for its other projects currently under development as each project moves through to FID.