Perth Airport – Front End Engineering Design Report for a 5MWp Solar Farm

In November 2021, Perth Airport awarded Sunrise the contract to complete the FEED for a 5MWp solar farm. The FEED includes the activities and engineering design work that needs to be undertaken to accurately cost the capital investment of the project. The FEED report includes such things as the preliminary electrical drawings, solar farm grid connection, integration and communication report and a procurement and construction schedule. Our report also documents the key risks that remain on the project, the likelihood, and consequences of them occurring and the proposed mitigation measures we can undertake to reduce them.