Edenlife – Microgrid with 395kWp solar PV, 300kW/750kWh BESS & Diesel Generation

In May 2024, Sunrise completed a techno economic energy modelling report for the new Edenlife Byford residential estate. Due to a grid connection to the SWIS not being available for the new estate for up to 2 years, the report provided analysis of operating the estate off-grid. The modelling found the best business case would be to operate off-grid until a grid connection can be obtained. Therefore, the energy modelling also had to consider the appropriate technology used in the power system to ensure that a smooth transition to a grid connected system would be possible.

The energy modelling report led to Edenlife engaging Sunrise to complete a FEED study and then engaging us to deliver the off-grid renewable energy power station to power the estate from 2025 until a grid connection can be obtained in about 2 years.